Electrical Connections; On/Off Switch - Lamborghini Caloreclima 55 PM/2-E Manuel D'installation Et D'entretien

Bruleurs a gaz a deux flammes
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

ELECTRICAL CONNECTIONS

The installation technician should perform connections to the mains, thermostat line (TA-TC-TS-TMF) and safety
light if present.
55 - 70 PM/2-E
230V-5A-F "POLVERE QUARZO"
L1
L2
L3
N
230V-5A-F "SAND FILLED"
230V-5A-F "FUSIBLE AU SABLE"
IG
230V-5A-F "SANDGEFULLTE SCHMELZ"
230V-5A-F "RELLENO DE ARENA"
F
L1
L2
L3
N
F
LP
BRM
RM
RT
CT
MB
EC
400 V
230 V
LEGEND
BRM
Motor relay coil
Connector seal check
C.CT.
CT
Thermal relay contact
C.VE.PG. Connector gas valve-gas pressure
EC
Control electrode
F
Fuses
Anti-disturbance filter
FA
IG
Main switch

On/Off switch

Ima
LF
Operating light
LP
Lamp presence flame
Blocking-mode light
LR
LR1
Blocking-mode light (if present)
Burner motor
MB
If operating with a three-phase 230/240 V power supply without neutral, a connection jumper must be made between
terminals L3 and N of the MR transmission terminal board as well as a delta connection in the MB motor.
If operating with TMF, it is necessary to remove the connection jumper between terminals 1 and 2 of the MR transmission
terminal board.
Do not exchange the neutral with the phase wire.
Make the connection to an efficient earthing system.
COMPLY WITH GOOD ENGINEERING PRACTICES AND OBSERVE THE REGULATIONS IN FORCE.
TC
TS
LR1
ST
AT
FA
L
U1
N
U3
LF
Ima
LR
PS
1
2
2
2
3
4
MPE
(LGB.)
(SQN 3. PM/2)
MMS
2
1
8
N
LR
11
10
9
8
7
6
PA
5
6
7
8
9
10
11
MMS
Servo control motor terminal board LANDIS SQN 30...
Control box terminal board - LANDIS LGB...
MPE
MR
Transmission terminal board
Air pressure switch
PA
PGm
Minimum gas pressure switch
PS
Release-reset pushbutton
Motor relay contacts
RM
RT
Thermal relay
Boiler thermostat
TC
Tmf
2nd flame modulation thermostat (if present)
TR
Starting transformer
Main valve
VP
VS
Safety gas valve
PM/2
Funzionamento a 2 stadi
4
3
6
5
7
5
4
3
2
1
MR
TR
12
C.VE.PG
48
Tmf
MR
3
2
1
Togliere ponte 2-1
C.CT
1
VP
2
VS
PGm

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

70 pm/2-e90 pm/2-e140 pm/2-e210 pm/2-e

Table des Matières