4. Final operations
4.1
The cooker is fitted with a stability device such as a
proprietary stability chain as shown and firmly secured to the
fabric of the building.
Whatever the position, remember to leave enough room for
the cooker to be pulled out for cleaning and service.
4.2
After having made the electrical and gas hook-ups, level the cooker to the
floor using the adjustable feet that were previously screwed onto the bottom
of the cooker.
Should it be necessary to drag the cooker, screw the feet in completely and carry out the final
regulation only when the other operations are completed.
Check all connections for gas leaks with soap and water. DO NOT use a naked flame for detecting
leaks. Ignite all burners to ensure correct operation of gas valves, burners and ignition. Turn gas
taps to low flame position and observe stability of the flame. When satisfied with the hotplate,
please instruct the user on the correct method of operation. In case the appliance fails to operate
correctly after all checks have been carried out, refer to the authorised service provider in your
area.
84
Instructions for the installer
Stability chain
Levelling the cooker to the floor