Fresh Air Duct Installation; Motor And Drain Pump Maintenance; Drill Wall Hole For Connective Piping - HTW ADMIRA -D-035ADMR32 Manuel De L'utilisateur Et D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 86
Step 5: Fresh air duct installation
Dimension :
Duct joint for fresh air
Ø92mm(3.62")
Ø125mm(4.92")
Step 6: Motor and drain pump maintenance
(the rear ventilated panel is used as an example)
Motor maintenance:
1.
Take o the ventilated panel.
2.
Take o the blower housing.
3.
Take o the motor.
MODLE
9-12
Ø113mm(4.45")
MODLE
18-60
Ø160mm(6.3")
Motor
Blower housing
Ventilated panel
Pump maintainance:
1.
Remove four screws from the drain pump.
2.
Unplug the pump power supply and water
level switch cable.
3.
Detach the pump.
Step 7: Drill wall hole for connective piping
1. Determine the location of the wall hole
based on the location of the outdoor unit.
2. Using a 65mm (2.5in) or 90mm(3.54in)
(depending on models )core drill, drill a
hole in the wall. Make sure that the hole
is drilled at a slight downward angle, so
that the outdoor end of the hole is lower
than the indoor end by about 12mm (0.5in).
This will ensure proper water drainage.
3. Place the protective wall cu in the hole. This
protects the edges of the hole and will help
seal it when you nish the installation process.
CAUTION
When drilling the wall hole, make sure to
avoid wires, plumbing, and other sensitive
components.
Outdoor
˜ 12mm / 0.5 inch
Pump
Wall
Indoor
Page 23

Publicité

Table des Matières
loading

Table des Matières