Wood
Place the wood mounting across the roof beam,
then install the hanging screw bolts.
Wood mounting
Hanging screw bolts
New concrete bricks
Inlay or embed the screw bolts.
(Blade shape insertion)
Original concrete bricks
Use an embedding screw bolt, crock, and stick
harness.
Embedding screw bolt
(Pipe hanging and embedding screw bolt)
Steel roof beam structure
Install and use the supporting steel angle.
Hanging screw bolt
Hanging
bolts
CAUTION
The unit body must be completely aligned
with the hole. Ensure that the unit and the
hole arethe same size before moving on.
2. Install and t pipes and wires after you have
nished installing the main body.When
choosing where to start, determine the
direction of the pipes to be drawn out.
Especially in cases where there is a ceiling
involved, align the refrigerant pipes, drain
pipes, and indoor and outdoor lines with their
connection points before mounting the unit.
Roof beam
Ceiling
(Slide insertion)
Steel bar
Supporting
angle steel
3. Install hanging screw bolts.
Cut o the roof beam.
Strengthen the point at which the cut was
made. Consolidate the roof beam.
4. After you select an installation location,align
the refrigerant pipes, drain pipes, as well as
indoor and outdoor wires with their
connection points before mounting the unit.
5. Drill 4 holes 10cm (4") deep at the ceiling
hook positions in the internal ceiling. Be sure
to hold the drill at a 90° angle to the ceiling.
6. Secure the bolt using the washers and nuts
provided.
7. Install the four suspension bolts.
8. Mount the indoor unit with at least two
people to lift and secure it. Insert suspension
bolts into the unit's hanging holes. Fasten
them using the washers and nuts provided.
9. Mount the indoor unit onto the hanging
screw bolts with a block. Position the indoor
unit at using a level indicator to prevent
leaks.
Shockproof cushion
Washer
Hanging screw bolt
Confirm the minimum drain tilt is
NOTE:
1/100 or more.
Screw nut
Overhang part
Page 21