Airwell AW-FWDB018-N91 Manuel D'installation page 16

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

(î) Locale the hanging arm on the hanging screw boit (Refer to Fig 4. 9)
@ Hang the unit on the hanging arm by sliding backward. Securely tighten the mounting bolts
on bath sides (Refer ta Fig 4. 10 )
hanging screw boit
4) T he dimension of the unit
Models
AW-FWDB018-N91
AW-FWDB024-N91
4.lnstallation of unit
i
E
Hanging
E
LO
N
screw boit
1
0
N
Hanging arm
Fig4.9
Conneting point of refrigerant
pipe (Gas side)
Fig 4.10
A(mm)
B(mm)
C(mm)
1050
675
675
1050
11
Conneting point of refrigerant
pipe(Liquid side)
Downward declivity
Drain point
Lower between
(1-2)/100
D(mm)
E(mm)
235
933
440
235
440
933
Table4.1
F(mm)
188
188

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Aw-fwdb024-n91

Table des Matières