3. 3 Unpacking inspection
lnspect the equipment before installation. Do as follows:
1. Check for any damage or damp at outer surface after opening.
2. Check for name, specification, type of the unit meeting requirement and make sure the user's manual ,
qualification card are complete and the accessories are compliant to the packing list.
A. Checking the unit , refer to Table 3.1
Check item
1) Check if the surface is broken or hum id
when the packing is open
2) Check the pipe is ok.
UNIT
3) Check the accessory is ok.
4 )Checkif the gas pressure of unit is OK.
1 ) check if the PCB is ok.
2) check if the insert accessory is tight.
PCB
3) check if the connect of earth wire
is tight.
B. Keep check record as Table3.2
Unit name
Unit inspection
Problem and treatment
lnspector
3.4 Check the power of the unit
1. Before installing the unit, must check the specifications of power capacity, power cord and switch, to
ensure the unit accord with secure request.
2. The power of the unit should be connected with the special power switch with leakage protection
function.
3.Preparation before installation
Content
1.Packing
2.Unit treatment
3.PCBcheck
4.Fan and motor check
5.0thers
6
Check item
Fan
Check if the fan works well.
1 ) Check if insulation is ok.
2) Check if the connect of earth wire is tight.
Fan motor
3) Check if the wire connect of fan motor is
tight.
Year
Month
Table 3.1
Content
Table 3.2
Date