Installing The Door Station - SOMFY V 100+ Notice D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 1
3.1 Installing the door station
These operations must be performed with the power off.
Avoid installing the camera facing a light source, as images of visitors may be impaired.
We recommend that silicon sealant is applied between the rain shield and the wall/pillar (but not below the rain shield) and that
the door station is fitted at a height of approximately 1.60 m.
[1]. Route all the cables into the rain shield.
[2]. Fix the rain shield to the wall/pillar.
[3]. Connect:
• the monitor cable to the first 2 terminals on the door station:
M+ on the monitor to M+ on the door station
M- on the monitor to M- on the door station
• the electric latch/lock cable to terminals L+ and L- on the door station.
• the drive cable to the dry contact output (COM and NO) on the door station
Note: To feed the cables into the terminals, use a screwdriver to press on the square with the notch, feed the wires in, then
release.
[4]. Position the door station in the rain shield.
[5]. Screw the door station to the rain shield using the tamper-proof torx key provided.
1
3
M- M+ L- L+ NO COM NC
Monitor cable
Electric latch/lock cable
Copyright © 2022 Somfy Activités SA. All rights reserved.
3. REPLACING THE DOOR STATION
Gate drive cable
2
4
EN
5
3

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

V 350

Table des Matières