Advance Planning; Before You Begin - Thermador PROFESSIONAL VCIN60RP Instructions D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Advance Planning

Before You Begin

CAUTION
Before installing, turn power OFF at the service panel.
Lock service panel to prevent power from being turned
ON accidentally.
Parts Included
Metal transition with backdraft
damper
Stainless steel baffle filters
Grease trays
Side trims
Remote blower adapter
Fastener assortment
Literature packet
Installation Instructions
Tools and Parts Needed
Blower motor
Ductwork as necessary (style varies, see Table 2)
Additional sheet metal screws (as necessary for ductwork
installation)
1'' (25.4 mm) Strain relief
Aluminum tape (DO NOT use duct tape)
1/2'' (13 mm) Conduit if required (follow local codes)
11/32'' Nut driver
Framing material (as necessary for framework)
Circular saw or jigsaw
Tape measure
T-20 Torx screwdriver
Protective work gloves
Optional accessories available for separate purchase.
Refer to www.thermador.com for more details.
VCI2REMKS – Remote Control Panel
EXTNCB25 – 25 ft. Blower Connection Cable
English | 5 |

Publicité

Table des Matières
loading

Table des Matières