Advance Planning
Before You Begin
CAUTION
Before installing, turn power OFF at the service panel.
Lock service panel to prevent power from being
turned ON accidentally.
Parts Included
•
Metal transition with backdraft damper
•
Stainless steel baffle filters
•
Stainless steel grease trays
•
Stainless steel filter spacers
•
Side trims
•
Blower adapter
•
Fastener assortment*
* Hardware provided is for mounting through standard
thickness drywall or plaster into wood studs. Installers are
responsible to provide hardware for other types of
mounting situations.
Tools and Parts Needed
•
Blower (refer to the Ventilation Planning Guide for
compatible blowers)
•
Ducting as needed (refer to Equivalent Duct Lengths
for Commonly Used Transitions table)
•
Aluminum tape (DO NOT use duct tape.)
•
1/2'' (13 mm) conduit if required (follow local codes)
•
1'' (25.4 mm) Strain relief
•
Phillips screwdriver
•
T-20 Torx head screwdriver
•
11/32'' nut driver or socket and ratchet
•
Drill with 3/16'' (4.76 mm) drill bit
•
Framing material (as necessary for framework)
•
Circular saw or jigsaw
•
Wire stripper
•
Tape measure
•
Protective work gloves
Page. 5
IMPORTANT: DO NOT throw away any packaging until
appliance is fully installed.
Optional accessories available for
separate purchase
Refer to www.thermador.com for more details.
•
REMCPW – Built-in Remote Control Accessory
•
EXTNCB25W – 25 ft. Remote and In-line Blower
Extension Cable
•
WC8 - 8" Wall Cap
•
WC10 - 10" Wall Cap
•
RFPLT600P - Roof plate for use with 600 CFM Remote
Blower VTR630
•
RFPLT1000P - For use with 1000 CFM Remote Blower
VTR1030 and 1300 CFM Blower VTR1330