Wet/Dry Vac Assembly; Insert Hose - Workshop WS0600VA0 Mode D'emploi

Masquer les pouces Voir aussi pour WS0600VA0:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

SP6863 Workshop 6 9 GALLON
1. Line up front of power head assembly
with vacuum port located on the front
of the drum, as shown.
2. Place power head assembly on top of
drum.
3. Be sure lid completely covers the top
of the drum so leakage does not
occur.
4. Push down on top of the drum latch
areas to cause the flexible locking tabs
to hook onto the drum channel.
5. Make sure that the locking tabs are
snapped in place to prevent the lid
from coming off. (See inset).
Out
Flexible
Locking Tab
Top
Assembly
Push
Down
Pull Out
Flexible
Locking
Tab
Drum
Channel
7/27/12
2:01 PM

WET/DRY VAC ASSEMBLY

Drum
Push
Down
Page 7

Insert Hose

Insert the push button end of the Dual-
Flex™ Locking hose into the inlet of the
Vac. The hose should snap into place.
To remove the hose from the Vac, press
the release button in the hose assembly
and pull the hose out of the Vac inlet,
as shown.
Vacuum
Port
7
Power
Head
Assembly
Release
Button

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ws0900va0

Table des Matières