If it is sealed incorrectly, the thread can be damaged and the sealing
effect can be reduced.
Depending on the pump type, teflon tape or the quick disconnect
unions are used to install the pipe.
For ABS bonding, a curing time of at least 12 hours must be observed.
The pump can be damaged by strains being placed on the pump!
2. The pipe should be independently supported in compliance with
3. Ensure that any leaks cannot cause consequential damage. Install
5.4
Electrical connection
WARNING! Risk of electric shock due to incorrect connections!
WARNING! Risk of electric shock due to voltage on the housing!
06/2014
VG 766.2000.055
Take up pipe directly before the pump and the pipe should be
independently supported.
VDMA standard sheet 24277. Compensators must be installed for
pipe diameter of 90 mm or larger. They are recommended for
d = 75 mm.
suitable drainage if necessary.
Observe VDE and utility company regulations.
Install swimming pool and its protection according to
DIN VDE 0100-702.
Install a switch with at least 3 mm contact opening per pole to
interrupt the power supply.
A built-in or external overload switch which is set correctly must be
installed for pumps with three-phase or A.C. motor without motor
protection (see pump data sheet). In doing so, observe the values
on the motor name plate.
Protect power supply with a ground fault circuit interrupter, nominal
residual current I
Δ N
Only use suitable connection types according to regional
regulations.
≤ 30 mA.
5 Installation
EN 43