Miles Industries STONEFIRE Valor SFMK01 Manuel D'installation page 6

Encadrement intérieur
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

KIT ASSEMBLY
1.
Locate leg brackets to sides of engine and secure
with 4 #8 screws; locate and secure rear support.
2.
Secure duct to leg framing using 2 screw holes lo-
cated through rear of leg.
3.
Position shield on top of duct and secure with 2 #8
screws.
Note: Shield can be placed in two positions depen-
dant of what Stonefire mantel is being installed.
6
4.
Locate and secure standoffs to rear corners of engine.
5.
Place the insulation pad on top of the engine, cutting
around the pipe if installing a top vent.
6.
Place engine into cavity and secure to framing.
7.
Rest top cover onto legs and secure to framing.

Publicité

Table des Matières
loading

Table des Matières