2.3 Installation, initial operation,
maintenance
Installation, initial operation, maintenance and re-
pairs have to be carried out by authorised and
qualified tradesmen.
(EN 5011 part 1 and VDE 1000 part 10 for work on
the electrical installation).
3
Transport and packaging
3.1 Transport inspection
Upon receipt, check delivery for any damages
caused during transit
Any damages must be reported immediately upon
receipt.
4
Installation and assembly
4.1 Installation advice
DANGER
Before starting work, make sure that the pi-
pework and components have cooled down
and been drained.
Before starting work, disconnect electrical
components (controllers, pumps etc.) from
power
The boiler connection system "Regumat" is sup-
plied preassembled.
The "Regumat" is available with or without heating
circulation pump. The individual components of
the model without pump are supplied loosely con-
nected.
After installation of the pump, the connections
have to be tightened with a torque of:
– Collar nut G 1
45 Nm
Check connection for leaks.
When leaving the factory, the supply pipe is on the
right hand side but it can be changed on site (see
4.5).
8
4.2 Installation advice
4
3
Remove supply (1) and return column (2) from the
insulation. Pull off the front insulation (4) and the
insertion block (3) and loosen the screw (7) of the
wall bracket (6).
Determine position of the station on the wall and
fix the wall bracket with the enclosed screws. Use
rear insulation as jig.
Mount rear insulation onto the wall bracket, hang
supply and return column into it and protect
against twisting by use of the locking plate (8) and
screw.
Attention: When installing conventional pumps
(asynchronous motors), use the blind cover in-
stead of the insertion block.
4.3 Check valve
The check valve prevents a gravity circulation of
the heating water when the pump is switched off.
Check valve
closed
The check valve is closed in operating position;
passage is only possible in flow direction.
When putting the system into operation and during
maintenance work (filling and flushing), the check
valve must be opened.
2
1
5
6
7
8
open