ESAB Multimaster 300 Manuel D'instructions page 28

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

sectIon 3
Cylinder Valve Connection
Nut
figure 10 - r-33 regulator
never stand directly in front of or behind the regulator
when opening the cylinder valve. always stand to one
side.
H. Open the cylinder valve SLOWLY a fraction of a turn. This
will prevent damage to the gauge and critical components
in the regulator. When the gauge needle stops moving,
then open the cylinder valve fully.
I.
Using a leak test solution, such as P/N 998771 (8 oz. ctr)
or soapy water, test for leakage around the cylinder valve
stem, the regulator inlet connection, and the hose con-
nections at the regulator. Correct any leaks before starting
work.
3.8.1 to regulate floW
Flow is controlled by adjusting the flowmeter valve until de-
sired flow is indicated by the ball float in the flowmeter tube.
Always take the reading across the TOP of the ball.
Flow Tube
Control Valve
Pressure
Gauge
28
InstallatIon

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Multimaster 300x

Table des Matières