mspa Alpine Manuel D'utilisation page 11

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Additional requirements for outdoor installation
Make sure to set up the spa on a firm, level and smooth surface that is strong enough to support the full
weight of the filled spa and maximum occupants.
Do not set up the spa on grass or dirt, as this increases the amount of debris entering the spa, and
damage the spa floor.
Do not leave the spa tub exposed to direct sun light for longer lifespan.
Always keep the manometer on yellow section when using the spa at a temperature higher than 20°C
(68°F) or exposed to sunlight for a short time.
It is recommended to install and leave the spa outside at a temperature not lower than 4°C(39°F) to
ensure the water inside the circulation system, pump, pipe are not frozen. Put a Heat Preservation Mat
between the spa bottom and the ground to prevent heat loss from the bottom of the spa and to provide
better heat retention.
PRCD Testing
Risk of electric shock: This product is provided with a PRCD located at the end of the power cord. The
PRCD must be tested before each use. Do not use the spa if the PRCD does not function properly.
Disconnect the power cord until the fault has been identified and corrected. Contact a licensed electrician to
correct the fault. There are no serviceable parts inside the PRCD. Opening the PRCD will void the warranty.
1.
Plug the machine into the mains.
2.
Press the RESET button on the PRCD. The indicator turns red.
3.
Press the TEST button on the PRCD. The red color shown on the indicator should disappear. Otherwise the
PRCD is faulty. Do not use the spa if the spa is faulty. Contact a qualified electrician to correct the fault.
4.
Press the RESET button on the PRCD again. The indicator should turn red. If yes, the spa is ready for use.
1.
PRCD doesn't work on faulty sockets or plug
boards.
Spa Control Unit Connected External Equipotential Bonding Conductors
A qualified electrician shall wire the spa control unit to the household equipotential terminal using a minimum
1.5mm² solid copper conductor.
!
WARNING
2.
RESET
RESET
TEST
Indicator
11
3.
RESET
TEST
TEST

Hide quick links:

Publicité

Table des Matières
loading

Table des Matières