Installation; Unpacking; Leveling The Unit - Antunes ESDZ-1200 Manuel Du Propriétaire

Station à œufs à deux zones
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Unpacking

1. Remove unit and all packing materials from
shipping carton.
NOTE: If any parts are missing or damaged, con-
tact Antunes Customer Service IMMEDIATELY at
+1-877-392-7856 (toll free).
2. Remove information packet.
3. Remove all packing materials and protective
coverings from the unit.
4. Wipe all surfaces of the unit with a hot damp
cloth.
NOTE: Do NOT use a dripping wet cloth. Wring it
out before use.
5. Clean the Egg Rings, Egg Rack, Top Cover, and
Scrap Pans in hot, soapy water. Rinse in clear
water and allow to air dry.
6. Reassemble all parts to unit.

Leveling the Unit

The unit must be placed on a level surface. The unit
comes with 4 individually adjustable legs to assist in
leveling. Be sure to place the unit on a sturdy flat sur-
face and adjust the legs as needed to ensure the unit
is level. Turn legs clockwise to shorten or counter-
clockwise to lengthen.
To verify if the unit is level, use a level (if available).
If a level is not available, open the Top Cover and
Egg Rack and pour a small amount of water directly
onto the cool grill surface. If the unit is level, the water
should pool in the middle and not drain toward a certain
section of the unit. Make adjustments as required.
Turn Leg
Clockwise
to shorten.
IMPORTANT
Failure to level the unit may result in unevenly
cooked product.
P/N 1013028 Rev. B 10/20

INSTALLATION

Turn Leg
Counter-clockwise
to lengthen.
5
EGG STATION DUAL ZONE
Figure 1. ESDZ-1200
Rear Top
Cover
Front Top
Cover
Rear Egg Rack
and Rings
Front Egg Rack
and Rings
Rear Grill
Front Grill
Surface
Surface
Pivot Rod
Figure 2. Components
Egg Ring
®

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

9300643

Table des Matières