Preface; Safety; Scope Of Delivery; Intended Use - Maico PP 45 RHK Notice De Montage

Masquer les pouces Voir aussi pour PP 45 RHK:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1 Preface

1 Preface
These instructions contain important information
about preparing for installation and installing
the unit components during the shell con-
struction phase.
Observe the attached safety instruction
sheet.
• For information re-
garding final installa-
tion
• For information on the
installation of ventila-
tion components,
commissioning and
the large variety of
setting possibilities for
the ventilation system
• For commissioning
software
• For information on
operation
Further instructions and videos
• Brief instructions for changing filters, setting
ventilation levels and operating modes
• Video PP 45 RC/PPB 30 Installation
• Video PP 45 Filter change / Video PPB 30 Filter
change
• Video - Connecting controls
• Video - PP 45 RC Teaching-in master and slave
• Video - Installation and teaching-in radio switch
DS 45 RC
• Video - RLS 45 K service menu , Video - RLS 45
O service menu, Video - PP 45 RC service menu

2 Safety

• Read these instructions and the enclosed
safety instructions carefully before installa-
tion.
• Follow the instructions.
• Pass these instructions on to the owner/operat-
ing company for safekeeping.
24
→ PP 45 installation in-
structions for final as-
sembly kit or PPB 30 in-
stallation instructions
for final assembly kit
→ PP45/PPB 30 install-
ation and commission-
ing instructions
→ PP 45 / PPB 30 op-
erating instructions

3 Scope of delivery

Scope of delivery depends on system config-
uration → Installation dimensions [} 36].
• Safety instruction sheet
• External cover PP 45 AK / PP 45 AW /
PP 45 AE / PP 45 AS / PP 45 AKR /
PP 45 AKB / PPB 30 AK / PPB 30 AW /
PPB 30 AE / PPB 30 AS → Installation in-
structions for external cover.
• Shell sleeve, short PP 45 RHK (0059.0081)
• Shell sleeve, long PP 45 RHL (0059.0082)
• Wall sleeve, plaster protective cover and
shims → Installation [} 28].
• Soffit element PP 45 LE (0093.0179)
• only for connection to PP 45 units
• Soffit element, rubber seal wall sleeve, com-
plete stainless steel external grille (with ex-
ternal grille, holder and wall seal)→Installa-
tion [} 28].
• Optional: Extension element PP 45 LEV
(0093.1483) → Installation [} 28].
• Compensating frame PPB 30 ARE
(0093.1501) / PPB 30 ARW (0093.1525)
• Compensating frame for mounting on thin
walls. The external covers can be mounted
on the compensating frame.
• PPB 30 ARE (stainless steel compensating
frame) with the fixing plate PPB 30 ARE BB
is used for installing the PPB 30 AE and
PP 45 AE.
• PPB 30 ARW (white compensating frame)
with the fixing plate PPB 30 ARW BB is
used for installing the PPB 30 AW and PP
45 AK / PP 45 AW . No fixing plate is re-
quired when installing the PPB 30 AK.
• Fixing plate PPB 30 ARE BB (0093.1526) /
PPB 30 ARW BB (0093.1527)
• Fixing plate for compensating frame PPB 30
ARE / PPB 30 ARW.

4 Intended use

PP 45/PPB 30 units with heat recovery are used
for air extraction/ventilation of apartments, offices
and similar rooms. They are suitable for new
buildings and renovation work. The units are de-
signed for 24h operation. The housing unit's vent-
ilation system should be configured in accordance
with DIN 1946-6.

Publicité

Table des Matières
loading

Table des Matières