Installation And Check Before Treatment - NSK VIVA MATE G5 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 47
3

Installation and Check before Treatment

3-1 To connect the Motor
Align ' ' on the motor cord plug with ' ' on the upper
part of the motor socket, and insert the motor cord plug
twisting.
3-2 To connect the handpiece (Option)
3-2-1 To connect the handpiece (Option)
insert the handpiece to the motor insert
portion and turn till the locating pin
clicks.
handpiece to the motor insert portion.
3-2-2 To remove the handpiece (Option)
Hold the motor and the handpiece separately and disconnect with care.
rotation.
CAUTION
3-3 To connect irrigation tube (Option)
CAUTION
water may leak.
Handpiece (Option)
Align
Alignment pin

Publicité

Table des Matières
loading

Table des Matières