Gas Train Assembly; Application Of The Burner To Boiler - Burner Connection To Gas Mains - baltur TBG 55 Mode D'emploi

Masquer les pouces Voir aussi pour TBG 55:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

APPLICATION OF BURNER
TO BOILER
HEAD UNIT ASSEMNLY
A) Adjust the position of
connector flange 5 by loose
ning the screws 6 so that
the combustion head pene
trates the advised amount into
the combustion
chamber as recommended by
the generator's manufacturer.
B) Position the seal insulation 3
on the tube unit inserting cord
2 between flange and seal.
C) Fasten the Combustion Head
unit 4 to the boiler 1 by means
of the stud bolts, washers and
the nuts provided 7.
Note:Competely seal the space
between the tube unit of the bur-
ner and the hole in the refractory
panel using suitable materials to
do so.

GAS TRAIN ASSEMBLY

There are different assembly
possibilities 8, 8a, 9 of the valves
train as shown in the diagram
alongside.
Select the best position according
to the particular arrangement of
the boiler room and the gas pi-
ping's entry position.
N.B. In the case of very large
vales e.g. DN65 or DN80, make
sure there is sufficient support
to prevent excessive stresses
on the gas train connector.
ASSEMBLYOFVENTILATION
SYSTEM
A) Position the half-hinge on the
burner scroll in line with those
on the combustion head as
sembly.
B) Put the hinge pin 10 in the
position considered most
suitable.
C) Connect the cables (switch on
and ionisation) to the
corresponding electrodes,
close the hinge, locking
the burner by means of
screws 11.
0006081041_200708
2 / 71

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Tbg 55pTbg 85pTbg 120pTbg 150pTbg 210p

Table des Matières