venting requirements
EN
2.4
horizontal termination
40'
35 3/4'
(429")
30'
V
20'
15'
10'
5'
4 3/4'
(57")
1 1/2'
(18")
0'
14
W415-1673 / A / 10.07.19
5'
1 1/2'
(18")
0'
(For vent runs that exceed the graph
parameters, a power vent is required).
V + H are measured from the centre of vent
elbows. Elbows are considered as 90º.
Two 45º elbows = One 90º elbow.
10'
15'
H
1-5 elbow zone
1-4 elbow zone
1-3 elbow zone
1-2 elbow zone
20'
17 1/4'
(207.6")
25'