6.2. Maintenance schedule

Every six months:
Visual inspection of the power supply leads
Visual inspection of the cable holders and the wiring
Visual inspection of accessories, such as for example
suspension device, lifting devices, etc.

6.3. Maintenance work

Visual inspection of the power supply leads
The power inlet leads must be inspected for bubbles,
cracks, scratches, scour marks and/or crushing zones.
If damages are detected, the damaged power inlet lead
must be replaced immediately.
The leads may only be replaced by the manufacturer
or an authorized/certified service workshop. The ma-
chinery must only be started after appropriate repair
of the damage!
Visual inspection of the cable holders (biners) and the
wiring (traction cable)
If the machine is used in basins/shafts the hoisting wires/
cable holders (biners) and the wiring are subject to con-
stant wear and tear. Regular inspections are required to
prevent a complete wear and tear of the hoisting wires/
cable holders (biners) and/or wiring and a complete dam-
age to the power cable.
The hoisting wires/cable holders (biners) and the wir-
ing must be replaced immediately if there are slight
signs of tear and wear!
Visual inspection of accessories
The accessories, such as for example suspension devic-
es, lifting devices, etc. must be checked for correct fitting.
Loose or defective accessories must be repaired/replaced
immediately.