Float switch for wire rope coupling
Pumps without float switch can be provided later with a
HOMA float switch for wire rope coupling. The electrical
connection is carried out by intercoupling the float switch
between the power socket and mains plug of the pumps.
If the float cable is installed later, fix it on the pump accord-
ing to the desired switch distance and the switch level on
the pump, the ascending pipe or another fixed installed
point. Under no circumstances the float with the cable
must be thrown into the medium, since correct switch
is only possible with a rotational movement of the float
around the mounting point of the cable. Possible conse-
quences in the event of non-compliance are flooding (the
pump does not start)/destruction of the pump due to dry
run (the pump does not switch off).
Important: After each change of the mounting of the float
a correct function of the float switch must be checked
with a test run.
5.3. Use of chains
Chains are used to lower/lift the pump into/out of the
mechanical room. They are not provided for securing a
floating pump. For use according the instructions follow
these steps:
•
Fix one end of the chain at the provided eyelet/the
handle of the pump.
•
Fix the other end on the lifting device.
•
Tighten the chain and lift the pump slowly and in a
controlled manner.
•
Swing the pump subsequently over the mechanical
room and lower it carefully.
•
Lower the pump as far as the operation point and en-
sure a steady position of the pump.
•
Remove the chain from the lifting device and safe-
guard this on the chain guard, which is at the upper
edge of the mechanical room. This ensures that the
chain cannot fall into the mechanical room and does
not pose danger to anyone.
5.4. Commissioning
This chapter contains all important instructions for oper-
ating personnel for safe commissioning and operation of
the machinery. The following must be complied with and
checked:
•
Type of installation
•
Operation mode
•
Minimal submersion in water / maximum submersion
depth
After a longer downtime these points must also be
checked and detected defaults must be repaired!
The operation and maintenance manual must always be
kept with the machinery, or in a dedicated place where it
is accessible for the entire operating personnel.
The following points must be taken into account to avoid
personal and material damage when troubleshooting ma-
chinery failures:
The commissioning of the machinery must only be
carried out by qualified and trained personnel in com-
pliance with the safety regulations.
•
All personnel that is working on the machinery must
have received, read and understood the operating in-
structions.
•
Activate all safety equipment and emergency switch-
offs before commissioning.
•
Electrotechnical and mechanical settings must only
be carried out by specialists.
•
This machinery is only suitable for the use under the
indicated operating conditions.
5.5. Preparation work
The machinery was constructed and fitted according to
the latest technology, so that it works for a long time and
reliably under normal operating conditions. This requires
however that you comply with all requirements and in-
formation. Small oil leakages of the floating ring seals on
delivery are not problematic, but they must be removed
before lowering/immersion into the medium.
Please check the following points:
•
Cable run - no loops, slightly tightened
•
Check temperature of the medium and submersion
depth - see machinery data sheet
•
If a tube is used for pressure, this must be rinsed with
clear water so that no deposits lead to obstruction.
•
The pump pit must be cleaned for wet installation
•
The pressure-sided and suction-sided pipework sys-
tem must be cleaned and all gate valves must be
opened
•
The pump casing must be flooded, e.g. it must be
filled completely with the medium and it must not
contain an air. The de-aeration can be carried out by
means of suitable venting devices in the system or, if
available, by air-vent screws on the pressure socket.
•
Check accessories, pipework, suspension devices for
firm and correct fitting
•
Check available level controls/protection against dry
run
5.6. Electrical system
The respective local and VDE regulations must be com-
plied with when choosing and installing the electrical
leads as well as connecting the motor. The motor must be
protected with a circuit breaker. The motor must be con-
nected according to the wiring diagram. Note the direction
of rotation! In the event of wrong direction of rotation the
machine does not perform as indicated and it can become
damaged under unfavourable circumstances.