Profroid QUIETOR GQH ZB190 T5TWIN H N P Notice D'instructions page 29

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Thorough leakage detection using a suitable detector should be carried out on the condenser unit.
After these tests, the gas must be removed. Fit the drier cartridges in their casing.
Dehydration of circuits
This operation must be carried out with all valves open (including solenoid valves) with connection to a vacuum pump:
- of the low pressureside
- of the high pressureside
The quality of drying should not be judged by the speed at which the level of vacuum is reached but on the effective time it is
held (24 hours at 0.7 mbar is a good standard).
The total increase in pressure during that period should not be more than 2.6 mbar. The residual moisture in the system should be less
than 20ppm.
When the installation is under vacuum, an insulation check of the motor should not be carried out nor should the compressors be started
before at least 1 bar of fluid pressure is reintroduced.
This is to prevent motor winding damage.
Oil
level checks
After a minimum of 2 hours of operation, check the oil compressor levels.        1/2 sight glass working. Levels
should never exceed the manufacturers' recommendations.
WARNING: Optional Oil separator is mounted without oil charge. Complement must be added by installer during commissioning.
Oils
The compressor Manufacturer's recommendations should be followed according to the type of refrigerant.
The use of colorants or UV tracers as leak detectors in the oil, is not allowed.
Oil
Mobil Arctic EAL 22 CC
ICI Emkarate RL32CF
This table is not exhaustive, but summarises the principal oils used. If any other oil is to be used, we would advise contacting PROFROID
or the compressor manufacturers.
Refrigerant
fluid charge
It is possible to charge in liquid phase when the installation is under vacuum through the charging valve provided on the liquid receiver
(depending on models).
The charging bottle must remain connected to this valve permanently during the whole start-up period to enable instant adjustment while
charging the installation
Fan
checks
Direction of rotation
Check that the fan is rotating in the correct direction,
Suction on the coil.
Pre-Setting of Control Systems
- Pre-set the LP regulation pressure switch and test manually.
- Pre-set the fans speed control.
The condensing pressure is regulated through the fans speed control that fluctuates speed of the fan motors according to the setting
chosen.
Refrigerant
R134a / R407F / R404A/
R507
Fonct.
Device
LP
R404A
Comp.
R507
pressure
R407F
Safety
switch
Device
Fonct.
Fluid
LP
Comp.
saferty
R134a
pressure
switch
Fluid
Applic.
Pre-set
Cutting : 1,5 bar
Medium
Engagement :3 bar
Cutting : 0,3 bar
Low
Engagement :1,0 bar
Applic.
Pre-set
Cutting: 0.3 bar
Medium
Temp
Engagement :1,0 bar
26

Hide quick links:

Publicité

Table des Matières
loading

Produits Connexes pour Profroid QUIETOR GQH ZB190 T5TWIN H N P

Ce manuel est également adapté pour:

Quietor gqh zbd152 t5 tw h n pQuietor gqh zb152 t5twin h n pQuietor gqh zb132 t5twin h n pQuietor gqh zbd114 t5 h n pQuietor gqh zbd114 t5 tw h n pQuietor gqh zb114 t5twin h n p ... Afficher tout

Table des Matières