2. Layout and items supplied
2.1 Layout (Fig. 1-3/12)
1. Top push bar
2. Bottom push bar
3. Motor unit
4. Hoe blades
5. Cable strain-relief clamp
6. Two-hand safety switch
6a Two-point switch
6b Selector lever
6c Power plug
7. Cable securing clips
8. 2x screw for installing the top push bar
9. 2x screw for installing the bottom push bar
10. 2x screw for installing 2-hand safety switch
11. 2x nut M6
12. 2x wing nut
2.2 Items supplied
Please check that the article is complete as specifi ed in the scope
of delivery. If parts are missing, please contact our service center or
the sales outlet where you made your purchase at the latest within 5
working days after purchasing the product and upon presentation of
a valid bill of purchase. Also, refer to the warranty table in the service
information at the end of the operating instructions.
•
Open the packaging and take out the equipment with care.
•
Remove the packaging material and any packaging and/or trans-
portation braces (if available).
•
Check to see if all items are supplied.
•
Inspect the equipment and accessories for transport damage.
•
If possible, please keep the packaging until the end of the guaran-
tee period.
Anl_PE_EBH_7530_SPK7.indb 213
Anl_PE_EBH_7530_SPK7.indb 213
- 213 -
GB
21.08.15 09:02
21.08.15 09:02