Tuthill Fill-Rite 700V Serie Manuel D'installation, Fonctionnement Et Securite page 6

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Typical "Island" Installation
Materials:
1-1/4" threaded suction pipe, cut to extend 32-1/2" above the island.
FRPA 125 Pedestal Kit (includes Pedestal Pipe, Base, & Coupler).
Threaded pipe joint sealant appropriate for application.
Installation Procedure:
1)
Remove the coupler from
the pedestal pipe by
loosening the set screws.
2)
Slip the pedestal pipe /
pump base assembly over
the 1-1/4" suction pipe.
3)
Loosen the screws in the
pedestal base to allow the
pedestal pipe to slide down
exposing the end of the
suction pipe.
4)
Screw the coupler onto the
suction pipe; seal threads
liquid tight with appropriate
thread sealant.
5)
Slide the pedestal pipe into
the coupler and tighten the
set screws.
6)
Tighten the screws in the
pedestal base.
7)
Mount the pump on the
coupler seal threads liquid
tight with appropriate
thread sealant.
WARNING! Threaded pipe joints and connections should be sealed with the
appropriate sealant or sealant tape to minimize the possibility of leaks.
TANK FLANGE
6
2' STD. PEDESTAL COUPLING
700F3050 PEDESTAL BASE
MAXIMUM LIFT
Gasoline 10' (3 m)
Diesel 12' (3.7 m)
Additional specifications on page 15.

Publicité

Table des Matières
loading

Table des Matières