Final Preparation; User Instruction - Erreka VULCAN VU31LB Manuel De L'installateur

Actionneur hydraulique pour portes battantes
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

INSTALLATION
4

FINAL PREPARATION

Connections and checks
F
< 400N in spaces between 50mm and 500mm
d
F
< 1400N in spaces> 500mm
d

User instruction

1 Instruct the user with regards to the use and
maintenance of the facility and provide him/her with
the use manual.
50
Installation manual
1 Carry out the installation and the connections for all
the elements of the facility, in line with the control
panel instructions.
Except in VUS models (which have a patented
obstacle detection), it is necessary to install
additional protection devices in order to fulfil
the requirements of standard EN 12453:2017.
2 Check that the mechanism is correctly regulated.
The opening and closing forces must be
adjusted to respect the values indicated in
standard EN 12453:2017, as shown in the
attached chart. The measurements must be
made in line with the method described in
standard EN 12453:2017.
For models without a patented safety device,
the gate should not exercise a force in excess of
150N (15kg).
3 Check the operation of all the installation elements,
especially the protection systems and the manual
operation unlocking system.
2 Point to the gate, showing that it opens
automatically, and indicating how to operate it
manually.
Where
appropriate,
operation is using the remote control.
indicate
that

Publicité

Table des Matières
loading

Table des Matières