Frame 2 Construction
Fig.2
59''
2'' Lag screw
2-1/2'' screw
B. Frame 2 Construction
1. Measure and position brackets on 4'' x 4'' x 120'' as shown in (Fig.2).
2. Attach upper 2'' x 4'' and lower 5/4'' boards as shown in (Fig. 2)
Note: Secure Shelf Lock with (2) Lag Screws only at this time.
(2) 4'' x 4'' x 120''
(2)
2'' lag screws
per bracket
47''
86''
48''
11
ProJect 512
(3)
2-1/2'' screws
(3)
2-1/2'' screws