Custom Schedules - STA-RITE SUPERMAX VS Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

8

Custom Schedules

To customize the run schedule for your SuperMax
Variable Speed Pump, the pump must be stopped. Be
sure that the Start/Stop button LED is not illuminated.
Programming a Custom Schedule:
Note: When programming, the LED light next to the
parameter ("Speed", "Time" and "Duration") you are
setting will blink.
1. Stop the pump if it is running by pressing the Start/
Stop button.
2. Press the "1" button. The LED above the selected
SPEED will begin to blink and the "Speed" parameter
LED will blink while editing. See Figure 7.
3000
Figure 7: Setting Speed
3. Use the "+" and "-" arrows to adjust the speed in
RPM for SPEED 1.
Note: Speed is adjusted up or down by increments of
10 RPM.
4. Press the "1" button again and the display will
change to SPEED 1 start time. The "Time"
parameter LED will begin to blink. See Figure 8.
8 : 00
Figure 8: Setting Start Time
5. Use the "+" and "-" arrows to adjust the daily start
time for SPEED 1.
SUPERMAX
VS Variable Speed Pump Installation and User' s Guide
®
VS
®
AM
6. Press the "1" button again and the display will change
to SPEED 1 duration. The "Duration" parameter LED
will begin to blink. See Figure 9.
2 : 00
Figure 9: Setting Duration
7. Use the "+" and "-" arrows to adjust the duration for
SPEED 1 in hours and minutes.
Note: The duration parameter is adjusted in 15
minute increments.
8. Pressing the "1" button will continue to cycle through
these parameters, but the changes are immediately
saved as they are adjusted.
9. Press the "2" button. The LED above SPEED 2 will
begin to flash and the corresponding parameter LED
will flash while editing.
10. Use the "+" and "-" arrows to adjust the speed in RPM
for SPEED 2.
11. Press the "2" button again and the display will change
to SPEED 2 duration.
Note: SPEEDs 2 and 3 do not have a start time,
as they begin their duration immediately after the
previous SPEED finishes.
12. Use the "+" and "-" arrows to adjust the duration for
SPEED 2 in hours and minutes.
13. Repeat steps 9-12 to program SPEED 3 and QUICK
CLEAN.
Note: Remember that the duration allowed for
SPEED 3 will be limited to the remaining time in
a 24 hour day. Any time in the 24 hour day not
programmed into SPEEDs 1-3, the pump will remain
in a stationary state.
[ SPEED 1 + SPEED 2 + SPEED 3 < 24 Hours ]
14. Press the Start/Stop button and ensure the LED is
lit. The pump is now on and will run the custom user-
programmed schedule.
Note: If the pump has been stopped via the Start/
Stop button, the pump will not run until the pump is
turned back on by the Start/Stop button. If the Start/
Stop LED is illuminated then the pump is on and will
run the programmed schedule.

Publicité

Table des Matières
loading

Table des Matières