Preliminary Operations; Packaging Removal; Operating Limits - Teddington SECO STEEL 50 Manuel Technique

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 49
3

Preliminary operations

3.1

Packaging removal

3.2
Inspection
EN
3.3

Operating limits

Note: On the left is indicated the extension of the operating limits if operating with versions
3.4
Positioning
26
M.SECOSTEEL 50-00 Manual TEDDINGTON_ITA_UK_DE_FR_ES_DK - 15/07/2021
Remove the packaging taking care not to damage the unit. Dispose of the packaging products
(wood, plastic, cardboard) and send them to be specialized collection or recycling centres (follow
local regulations in force.
All units are assembled and wired at the factory. Upon receipt of the unit, it must be inspected
immediately, carefully checking that it has not been damaged during transport or that there are no
missing parts; any complaints must be notified to the carrier and the factory or his representative
within 8 days.
Before use, check in particular that there are no dents on the external metal
panels, including those of the tank compartment. Also check that the cable, plug
and relative insulation are intact. Otherwise, it is FORBIDDEN to connect and
start the unit, which must be sent to an authorized service centre.
The following diagram represents the operating range of standard units.
Warning: It is strongly recommended to operate the unit within the limits shown below.
Overcoming these limits does not guarantee either the normal operation or the reliability of the
group or even the integrity (for special applications, please contact our office).
Operation table
equipped with a hot gas defrost system.
Place the device in order to guarantee an adequate air flow.
Warning: Make sure the device is positioned so that it does not come into contact with water.

Publicité

Table des Matières
loading

Table des Matières