Graf KLARO Easy Notice D'installation page 52

Masquer les pouces Voir aussi pour KLARO Easy:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5.7
Holding plate for SBR reactor with 4-tank systems
In 4-tank systems a holding plate is installed in the first SBR reactors which only has pipe clamps for se-
curing the sludge return and the aeration. In the last SBR reactor (with clear water lifter) a holding plate is
installed which has pipe clamps for securing the sludge lifter, the clear water lifter and the aeration.
5.8
Connecting the holding plate and lifters in the SBR basin
The lifters are then clamped to the holding plate. In
doing so, the excess sludge lifter (J) is mounted on
the left (short) side and the clear water extraction
lifter (I) is mounted on the right (long) side of the
holding plate.
5. Installation of the setting-up kit
Holding plate for 1st SBR
51 / 148
Holding plate for 2nd
tank
J
SBR tank
I

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Klaro eKlaro l

Table des Matières