Ignition; Warning; Routine Maintenance - Horus ALMA Manuel D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

24.IGNITION

Before switching the stove on, perform the following checks:
Check that the pellet tank is full.
Remove, clean and thoroughly check the vermiculite flame
retardant plate, the brazier and the ash pan then
reposition
them correctly.
25.

WARNING

Be careful: there may be burning residues.

Reposition the flame retardant plate and the ash pan;

Reposition the ash pan making sure that the bigger hole on its right side its with the
ignition resistance pipe.

Close the fire box door.

Make sure the device is connected to the power supply system.

Check that the back switch is on "I".

26.ROUTINE MAINTENANCE

Important: It is necessary to clean the brazier at every restart (F), clean the ash tray every 2-3 days (H) and the brazier support (G).
It is recommended once a month to remove the panels in vermiculite (P) by first disassembling the locking of the vermiculite panels
(##), the brazier (F), the ash drawer (H) and the smoke inspection cap (#) cleaning with a proper vacuum cleaner.
PARTS/FREQUENCY
TYPE OF CLEANING
Brazier (F)
Ash drawer (H)
Brazier support (G)
Locking of the
vermiculite panel (##)
Inspection plug
Fumes( (#)
Vermiculite panel (P)
1 DAY
2-3 DAY
Routine cleaning
Routine cleaning
Notice d'installation, d'utilisation et d'entretien
1 MONTH
Routine cleaning
1 YEAR
*
Extraordinary cleaning
* Warning
for extraordinary
maintenance
please refer to
section
46

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

AuraAlma 11.0c–9.0Aura11.0c–9.0

Table des Matières