The wheelhouse, Figs. 167 - 172, Plan II
Part
Description
No.
345
Wheelhouse floor
346
Fore-and-aft wall, aft
347
Aft wall
348-349 Aft transverse wall
350
Fore-and-aft wall, front bottom
351
Transverse wall, bottom
352
Fore-and-aft wall, front top
353
Transverse wall, top
354
Door frame
355
Wheelhouse door
356
Top deck bulwark
357
Top deck
- If you intend to install auxiliary working systems, cut
the oval opening in part 345.
- Assemble the wheelhouse on the wheelhouse floor
345 using the walls 346 - 351. Trim the upper fore-
and-aft walls 352 and the transverse wall 353 to fit,
and glue them in place. Repeat the procedure with the
doors 354, 355.
The air shafts, detail drawing entitled "Air shafts", Plan I, Fig. 201
Part
Description
No.
358
Air duct
359
Air duct
360
Side panel
361
Side panel
362
End panel
363
Small end panel
364
Air flap
365
Small air flap
- Assemble the air shafts from parts 358 - 365.
- Take the air ducts 358 and 359 and sand them to
shape.
Assembling the superstructure, Plan II
Part
Description
No.
366
Aft wheelhouse wall glazing
367-370 Wheelhouse glazing
371
Upper transverse wall glazing
372
Wheelhouse glazing
373-375 Superstructure glazing
376
Aft bulkhead door glazing
377
Glazed porthole
377A
Porthole glazing
- The individual superstructure sub-assemblies should
be painted at this stage.
- Glue the glazing panels 366 - 375 in place, following
the sequential numbers marked on the plan. The gla-
zing panel 376 should be attached to the inside of the
aft bulkhead door.
- Apply UHU akrylit to the wheelhouse, glue it to the
Material
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
Material
ply wood
ply wood
ABS
ABS
ABS
ABS
ABS
ABS
Material
Plastic transp. 0.5, laser-cut
Plastic transp. 0.5, laser-cut
Plastic transp. 0.5, laser-cut
Plastic transp. 0.5, laser-cut
Plastic transp. 0.5, laser-cut
Plastic transp. 0.5, laser-cut
Brass
Plastic transp. 0.5, laser-cut
© Klaus Krick Modelltechnik, Germany, Stand 06.2017
Size in mm
1.5, laser-cut
1.5, laser-cut
1.5, laser-cut
1.5, laser-cut
1.5, laser-cut
1.5, laser-cut
1.5, laser-cut
1.5, laser-cut
1.5, laser-cut
1.5, laser-cut
1.5,
1.5, laser-cut
- Trim the underside of the top deck bulwark 356, sand
it flat, and glue it to the top deck 357. Cut away the
top area of the bulwark as shown.
- The superstructure components cannot be glued in
place until the wheelhouse has been painted and
glazed.
Size in mm
5, laser-cut
5, laser-cut
1, laser-cut
1, laser-cut
1, laser-cut
1, laser-cut
1, laser-cut
1, laser-cut
- Drill holes in the side panel 360 and 361 and trim the
parts to fit. Glue the panels 360 - 365 to the air ducts.
- Glue the completed air shafts to the superstructure.
Size in mm
6 Ø x 8 Ø
bridge deck and position it carefully. Glue the top deck
on the wheelhouse. Glue the completed toolboxes
266, 267 to the top deck.
- Fit and glue the portholes 377 in the hull and stripes
of glazing behind. Take care that the glazing at the
portholes are glued well that the hull is water tight.
No.
Notes
off
1
plate 5
2
plate 5
1
plate 3
1 each
plate 5
2
plate 5
1
plate 5
2
plate 4
1
plate 6
4
plate 5
2
plate 5
1
vac. moulded
1
plate 6
No.
Notes
off
2
plate 8
1
plate 8
5
plate 7
1
plate 7
2
plate 7
1
plate 7
2
plate 7
1
plate 7
No.
Notes
off
1
plate 11
2 each
plate 11
1
plate 11
2
plate 11
2 each
plate 11
1
plate 11
20
rivet
2
plate 11
19