Battery Back-Up Installation - Napoleon Ascent Linear Série Manuel D'installation

Masquer les pouces Voir aussi pour Ascent Linear Série:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6.4

battery back-up installation

WARNING
!
Ensure the gas and electrical power to the appliance is turned off.
Appliance may be hot, do not service until the appliance has cooled.
note:
In the event of a power failure, your appliance can be operated using the supplied battery back-up.
Remove the safety barrier to easily access the control compartment.
A.
Turn off the gas and disconnect the electrical power supply from the appliance.
B.
Locate the battery housing inside the valve compartment.
C.
Install 2 "D" alkaline batteries (not supplied) into the battery housing. Ensure the positive and negative
D.
ends correspond with those identified on the holder.
Turn the gas and electrical power back on to begin operating the appliance.
E.
Reinstall the safety barrier. The safety barrier must be installed at all times during operation of the
F.
appliance.
Battery
Housing
Relay
Red (+
)
Black
(-)
Control
Module
electrical information
W415-3091 / B / 03.22.22
EN
37

Publicité

Chapitres

Table des Matières
loading

Table des Matières