Assembling The Charcoal Box; Positioning The Cooking Grid; Securing The Grill Lid - Pit Boss PBCSL200 Manuel D'instructions Et D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3.

ASSEMBLING THE CHARCOAL BOX

Parts Required:
1
x
Charcoal Box (#5)
Charcoal Box Airflow Plate (#4)
1
x
Charcoal Box Lid (#3)
1
x
Installation:
Place the charcoal box into the inner
shell of the grill. The feet of the
charcoal box will position correctly
into the grooves on the bottom.
Next, place the charcoal box airflow
plate into the base of the charcoal
box. This creates space between the
fan and the fuel for airflow. Note 3A.
Lastly, rest the charcoal box lid on
the top of the charcoal box. Note 3B.
4.

POSITIONING THE COOKING GRID

Parts Required:
1
x
Cooking Grid (#2)
Installation:
Place the cooking grid into the grill,
resting the edges on the interior
ledges of the inner shell.
IMPORTANT: The griddle in the centre
of the cooking grid should face up.
5.

SECURING THE GRILL LID

Parts Required:
Grill Lid (#1)
1
x
Installation:
Place the grill lid over the cooking
grid. Secure the two safety latches
from each side of the grill body to
the grill lid.
The unit is now assembled.
8
3A
3B
4
5
4
5
3
2
1

Publicité

Table des Matières
loading

Table des Matières