13.2.1

Visual inspection for general signs of corrosion

13.2.2

Measuring the ionization current

13.2.3

Measuring the inlet gas pressure

13.2.4

Testing for gas leaks

13.2.5

Carrying out a pressure test of the heating system

13.2.6

Checking venting systems

i
NOTICE
-
Check all gas and water pipes for signs of corrosion.
-
Replace any pipes that are corroded.
See subsection 12.5 "Measuring the ionization current".
See subsection 6.4.1 and .2 "Gas connection with natural gas" and "Gas connection
with propane".
See subsection 12.1 "Testing for gas leaks".
See chapter 9.2 "Filling the heating system".
Check the following points:
- Is the prescribed combustion air/flue system used?
- Have the instructions for configuring the flue system as specified in the relevant
Installation instruction for the flue gas system been observed?
- Check air intake and/or air filter and flue gas for obstruction, pollution or damage.
When an air filter is used the air filter must be replaced yearly on boilers
operating in normal circumstances.
The conditions (eg. supply air quality) in which the boiler is installed should
be taken into account. This will show whether the frequency of replacement
should be reduced or increased. If in doubt, contact RINNAI.
63

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

E85srnE110srnE60srpE85srpE110srp

Table des Matières