Rinnai E60SRN Instructions D'installation Et D'entretien page 11

Masquer les pouces Voir aussi pour E60SRN:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5.2 Mounting the boiler
i
NOTICE
i
NOTICE
!
CAUTION
!
WARNING
-
Remove the packaging materials.
-
Lay the boiler on its back during unpacking. Remove the cover from the
boiler. This part may be left off during installation. It must be placed on the
boiler and fixed with the screw behind the door and in the 4 quick releases
before the boiler is started up.
Turn the boiler to its side and remove the wall bracket from the back of the
boiler by removing the 2 screws.
The boiler can be mounted practically to any wall with the suspension bracket and the
enclosed mounting equipment.
- The wall must be flat and of sufficient strength in order to be able to securely hold
and support the boiler weight with its water content.
-
Take note of the necessary space around the boiler for installation of venting
system, pipework and servicing. See drawing on pages 12 and 13.
-
Drill the necessary holes using the template
-
Install the mounting bracket to the wall
-
The boiler must be installed using the included mounting hardware.
Lifting and carrying precautions:
To avoid personal injury please follow these recommendations:
-
Always lift the boiler with 2 people or use special equipment.
-
When lifting the boiler, bend the knees, and keep the back straight and feet
apart.
-
Do not lift and twist at the same time.
-
Lift and carry the boiler close to the body.
-
Wear protective clothing and gloves to protect from any sharp edges.
Lift the boiler only by the boiler's rear wall. Do not lift using the pipes on the
bottom of the boiler or the vent connections on the top of the boiler.
11

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

E85srnE110srnE60srpE85srpE110srp

Table des Matières