Visual Inspection For General Signs Of Corrosion; Measuring The Ionization Current; Measuring The Inlet Gas Pressure; Testing For Gas Leaks - Rinnai E Série Instructions D'installation Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

13.2.1

Visual inspection for general signs of corrosion

13.2.2

Measuring the ionization current

13.2.3

Measuring the inlet gas pressure

13.2.4

Testing for gas leaks

13.2.5

Carrying out a pressure test of the heating system

13.2.6

Checking venting systems

i
NOTICE
-
Check all gas and water pipes for signs of corrosion.
-
Replace any pipes that are corroded.
See subsection 12.5 "Measuring the ionization current".
See subsection 6.4.1 and .2 "Gas connection with natural gas" and "Gas connection
with propane".
See subsection 12.1 "Testing for gas leaks".
See chapter 9.2 "Filling the heating system".
Check the following points:
-
Is the prescribed combustion air/fl ue system used?
-
Have the instructions for confi guring the fl ue system as specifi ed in the relevant
Installation instruction for the fl ue gas system been observed?
-
Check air intake and/or air fi lter and fl ue gas for obstruction, pollution or damage.
When an air fi lter is used the air fi lter must be replaced yearly on boilers
operating in normal circumstances.
The conditions (eg. supply air quality) in which the boiler is installed should
be taken into account. This will show whether the frequency of replacement
should be reduced or increased. If in doubt, contact RINNAI.
65

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

E75cnE110cnE75cpE110cp

Table des Matières