Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Tools Required
• Hand or Electric Drill
• Adjustable Wrenches (2)
• File
• Pencil
• Utility Knife or Tube Cutter
(for plastic tubing)
Optional Materials
(For sinks without extra hole for faucet)
• Hand or Electric Drill
• Plumber Tape
• Drill Bits: 1/4-inch and
3/8-inch
NOTE: Not all tools listed will be necessary for installation.
Read installation procedures before starting to
determine required tools.

DIMENSIONS

15.50
(39.4 cm)
• Phillips Screwdriver
• Towel
• Safety Glasses
• Tape Measure
• Drill Bits:
1/4-inch and 3/8-inch
• Center Punch
• Respirator
• 1-3/8 inch Bi-metal or
Carbide Tipped Hole Saw
9.50
(24.1 cm)
ROM IV REVERSE OSMOSIS SYSTEM INSTALLATION AND OPERATION GUIDE
SELECTING A MOUNTING LOCATION
1 . Give consideration to the weight of the unit when
operating, i .e . when filled with water . Operating weight of
the ROM IV RO System is:
• System without Storage Tank - 10 .2 lbs (4 .6 kgs)
• Storage Tank - 29 .4 lbs (13 .3 kgs)
2 . The location should allow for:
• Minimum clearance of 2-1⁄2 inches (6 .3 cm) under the
cartridge(s) so they can be lowered for removal
and replacement .
• Adequate space for "in" and "out" water line
connections .
• Be near a drain for flushing .
3.25
8.85
(22.5 cm)
3.10
4.92
(12.5 cm)
Figure 1
10.5"
(26.6cm)
16.00"
(40.6 cm)
3

Publicité

Table des Matières
loading

Table des Matières