Phone: 866-356-1992 | Email: Support@eccotemp.com | Address: 315 - A Industrial RD Summerville, SC 29483
Installation Instructions Continued...
4. Evacuation of Burnt Gas
4.1. Evacuation of burnt gas pipe.
The burnt gas evacuation pipe must have the following diameters, depending on model:
• CEI-12 can only be attached to the following types combustion product evacuation pipes:
Pipe for fitting the draft diverter on the outside is 1 meter.
Couplings for draft diverters are found at specialist trade stores.
Pipe for fitting the draft diverter is 110 mm.
Recommended fluepipe vertical length is a minimum of 1 meter and maximum of 15 m.
4.2. Ensuring the correct evacuation of combustion gases.
To ensure the system is functioning with the water heater's nominal power, check the tightness of
the whole combustion gas evacuation system through a spray plate, cooled mirror or any other
approved apparatus,
4.3. Maintenance.
Recommended on an annual basis. This must be carried out by an Official Technical Service.
5. Mounting the Cover
If for any reason you need to remove the cover for installation:
5.1. Remove the gas knob and temperature selector by pulling them out.
5.2. Loosen the screws connecting the cover.
5.3. Assemble the controls by pressing them inwards.
Check and Commissioning
- Ensure that the installation meets on ALL REQUIREMENTS OF THE REGULATIONS IN FORCE IN THE
COUNTRY IN WHICH THIS INSTALLED.
- Check the complete sealing of the gas and water circuits.
- Turn on the heater and check its operation for 15 min, teach the user the proper handling and use
of heater and give this instruction manual
17
Product Support: Eccotemp.com/help-desk
Shop Online: Eccotemp.com/products
Store Locator: Eccotemp.com/locator