Vertical Air Terminal Installation - Napoleon HD35NT-2 Instructions D'installation Et D'opération

Masquer les pouces Voir aussi pour HD35NT-2:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

22

4.2.2 vertical air terminal Installation

EN
MAINTAIN A MINIMUM 2" (51mm) SPACE BETWEEN THE AIR INLET BASE AND THE STORM COLLAR.
NOTE : Fastening hardware provided with appropriate roof terminal and liner kits.
A.
Fasten the roof support to the roof using 6 screws. The roof support is optional. In this case the
venting is to be adequately supported using either an alternate
method suitable to the authority having jurisdiction or the optional
roof support.
B.
Stretch the inner fl ex pipe to the required length. Slip the inner
fl ex pipe a minimum of 2" (51mm) over the inner pipe of the
air terminal connector and secure with a minimum of
3 screws. Seal using a heavy bead of Mill Pac sealant
(W573-0007) (not supplied).
C.
Repeat using the outer fl ex pipe, using a heavy bead of red
RTV silicone (W573-0002) (not supplied) and a minimum of
3 screws.
D.
Thread the air terminal connector / vent pipe assembly
down through the roof. The air terminal must be positioned vertically
and plumb. Attach the air terminal connector to the roof support,
ensuring that the top of the air terminal is 16" (40.6cm) above the
highest point that it penetrates the roof.
E.
Remove nails from the shingles, above and to the sides of the
air terminal connector. Place the fl ashing over the air terminal
connector leaving a min. 3/4" (19mm) of the air terminal connector
showing above the top of the fl ashing. Slide the fl ashing underneath
the sides and upper edge of the shingles. Ensure that the air
terminal connector is properly centered within the fl ashing, giving
a 3/4" (19mm) margin all around. Fasten to the roof. Do not nail
through the lower portion of the fl ashing. Make weather-tight by
sealing with caulking. Where possible, cover the sides and top
edges of the fl ashing with roofi ng material.
F.
Aligning the seams of the terminal and air terminal connector,
place the terminal over the air terminal connector making sure
the vent pipe goes into the hole in the terminal. Secure with 3
screws.
G.
Apply a heavy bead of weatherproof caulking 2" (51mm)
above the fl ashing. Install the storm collar around the air
terminal and slide down to the caulking. Tighten to ensure that
a weather-tight seal between the air terminal and the collar is
achieved.
H.
If more vent pipe needs to be used to reach the appliance see
"HORIZONTAL AIR TERMINAL INSTALLATION" section.
W415-2197 / A / 09.14.17
WARNING
!
2" (51mm)
ROOF SUPPORT
INNER PIPE
AIR
TERMINAL
CONNECTOR
MILL PAC
SEALANT
(W572-0007)
INNER FLEX PIPE
OUTER RIGID PIPE
AIR INLET
BASE
CAULKING
STORM COLLAR
WEATHER
SEALANT
FLASHING
24.1E

Publicité

Chapitres

Table des Matières
loading

Table des Matières