Starting Locomotive Operation; Prior To Initial Commissioning; Running The Model In; Operating Instructions - Roco BR 03 0058-2 Série Manuel

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

▪ Prior to initial commissioning

In order to prevent poor running characteristics or damage from occurring, the coupling rod bearings
on your locomotive must be oiled prior to undertaking the initial commissioning. We recommend using
the ROCO oiler 10906

▪ Running the model in

Before use advisable to let the loco go around about 30 forwards and 30 minutes backwards without
load, to obtain an optimal circuit and best tractive power

▪ Operating instructions

Only for showcase

Starting locomotive operation

The smallest radius this model should run is R3
or rather R2 of the Track system (model without
tubes protecting pistons). Your locomotive will
run smoothly on clean tracks only. For this pur-
pose we recommend using item no. 46400, Roco
track cleaning van, or item no. 10002, Roco track
cleaning rubber, for removing heavy dirt.
11
19
19
19

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

722057220678206

Table des Matières