▪ Prior to initial commissioning
In order to prevent poor running characteristics or damage from occurring, the coupling rod bearings
on your locomotive must be oiled prior to undertaking the initial commissioning. We recommend using
the ROCO oiler 10906
▪ Running the model in
During the first five minutes the locomotive should run at medium speed.
▪ Operating instructions
Only for showcase
▪Fittings
Operation is possible with different couplings. We recommend using the Roco close coupling.
8072126920.indd 19
Starting locomotive operation
The smallest radius this model should run is R3
or rather R2 of the Track system (model without
tubes protecting pistons). Your locomotive will
run smoothly on clean tracks only. For this pur-
pose we recommend using item no. 46400, Roco
track cleaning van, or item no. 10002, Roco track
cleaning rubber, for removing heavy dirt.
Optional
19
19
28.05.2014 09:34:07