9. Commissioning

9.1 Drive motor

Requirements:
Compare mains conditions (voltage and frequency) with the specifications on the type plate of the motor.
Permissible voltage tolerance (DIN VDE 0530)
for rated voltage
for rated voltage range
The connecting cable must be dimensioned according the motor characteristics.
Secure the connecting cable with a strain relief.
The nominal motor output applies to a maximum ambient temperature of 40°C and an installation height not high-
er than 1.000m above sea level. The motor output will be reduced if these values are exceeded (see VDE 0530).
Suitable for "moderate" climates according to IEC 721-2-1.
NOTE!

9.2 Initial commissioning / Recommissioning

Checks prior to each start-up
Check whether the fastening screws have been tightened with the specified torque and retighten, if necessary.
Check whether all electrical connections are correct.
Check the rotational freedom of the mixing element.

10. Operation

NOTE!
The electric agitator does not have an I/O switch.
Devices for turning on and off the electric agitator have to be installed by the operator.
TA 504 Vers. 3 en 11/2021
+ 10%
+/- 5%
The operation of the electric agitator will heat up the drive motor.
Do not touch the motor during operation!
As soon as the drive motor is supplied with power,
the electric agitator will start to operate.
Subject to technical modifications!