Initial Operation - GEZE TS 5000 E BG Mode D'emploi

Bras à coulisse avec arrêt électrique pour montage côté opposé aux paumelles
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

TS 5000 E BG
7

Initial operation

7. 1
First Operation and Function Test
Open door leaf and engage in electrical hold-open device.
X
Disconnect power supply.
X
à The door leave closes.
7.2
Testing for acceptance (only when used with a hold-open device)
An acceptance test must be carried out in order to ascertain the correct function and installation according to
the regulations once the installation has been completed on site. Acceptance test to be performed by authorised
personnel; see document "Instructions for Installation, Commissioning, Operation and Maintenance of the GEZE
Hold-Open Device FA GC".
8
Maintenance, servicing, repairs
Regular maintenance is required. For more information on this, please observe the document "Instructions for
Installation, Commissioning, Operation and Maintenance of the GEZE Hold-Open Device FA GC".
9
Specifications
For technical data refer to document "Instructions for Installation, Commissioning, Operation and Maintenance
of the GEZE Hold-Open Device FA GC".
Initial operation
GB 7

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ts 5000 e

Table des Matières