Preparation - Sonnenkonig GENUA Mode D'emploi

Masquer les pouces Voir aussi pour GENUA:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4 Preparation

Important: When using an existing outlet box, make sure the box is securely attached
to the building struc-ture and can support the full weight of the fun. Failure to do this
can result in serious injury or death.
Turn off circuit breakers and wall swich to the fan supply line leads.
Warning: Failure to disconnect power supply prior to installation
may result in serious injury or death.
Determine mounting method to use.
A: closemount
B: Downrod mount or angle mount. (only some models)
Important: If using the angle mount, check to make sure the ceiling
angle is not steeper than 25°
Check to make sure blades are at least 80 cm from any obstruc-tion.
Check downrod length to ensure blades are at least 2.1 m above
the loor.
Secure mounting bracket to electrical box using screws, spring
washers, and lat washers (size 8 or M5) provided with the electrical
box.Use only proper plug diam 8 mm. Important: if using the angle
mount, make sure open end of mounting bracket is installed facing
the roof.
Remove blade arm mounting screws and washers from motor.
Discard plastinc.
If using closemount installation, remove rubber washer from bottom
of the canopy.
42

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Verona

Table des Matières