First Ignition; Pellet Loading; First Start Up - Royal DORA AIR Notice D'installation Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

9

FIRST IGNITION

The first ignition must be carried out
by the installer.
9.1

Pellet loading

• Open the pellet loading hatch.
• Load the pellets.
• Close the hatch.
The appliance, which is the subject
of this manual, is an indoor domestic
heating stove, powered exclusively by
wood pellets with automatic loading.
004778391 - 23/09/2021
ITALIANO

9.2 First start up

During the first ignition of the stove,
make sure the rooms are properly ven-
tilated as unpleasant odours or fumes
may be generated due to the evapo-
ration or drying of certain materials
used. This phenomenon will gradually
disappear.
Connect the appliance to the mains, operate the
power switch on the back of the appliance by
turning it to "I".
If the connection is correct, the appliance emits
a series of intermittent noises and the display
lights up.
Fig. 31
See the display manual.
Fig. 32
ENGLISH
FRANÇAIS
Fig. 33
77

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Grazia e air

Table des Matières