Fusion Installation; Anchor Bracket Installation - Zodiac Nature2 Fusion Manuel D'installation Et De Fonctionnement

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Zodiac
Install the anchor brackets on
each side foot of the vessel
Figure 2.

Anchor Bracket Installation

3.4
Nature

Fusion Installation

2
1.
Make sure the pool pump is turned off.
2.
Locate a suitable section of pipe to install the
vessel, approximately 43 cm (17
conforms to the installation requirements outlined
in Section 3.2.
3.
Cut out a 35 cm (13
pipe to insert the vessel (see Figure 4).
Nature
Fusion Inground
2
Flow
Figure 3.
Nature
Fusion Installation Example
2
Nature
Fusion Inground
®
long, that
")
/
") section of the 5 cm (or 2")
7
8
Heater
Flow
|
Installation and Operation Manual
4.
Connect the outlet from the filter or heater to the
vessel inlet port with the appropriate Schedule 40
PVC pipe; secure the connection with a pipe glue
that is compatible with PVC.
NOTE Reducer bushings can be used to
accommodate 3.8 cm (1.5") plumbing with no
effect on the operation of the Nature
5.
Connect the vessel outlet port to the pool return
line with the same type of PVC pipe and secure
the connection with pipe glue. Allow sufficient
time for the glue to dry.
Pool
Return
ENGLISH
5.7 cm X 0.6 cm (2¼" X ¼")
Stainless Steel Screws and
Stainless Steel Washers
9 cm (3 1/2")
Thick (Min)
Concrete Pad
Pump
Filter
Pool
Intake
Spa
Intake
Spa
Return
Page 9
Fusion.
2

Publicité

Chapitres

Table des Matières
loading

Table des Matières