Jacuzzi PURE AIR BATH Série Instructions D'installation Et D'utilisation page 10

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Fuzion™ Frame Installation
If you are installing a Fuzion™ bathtub, please
refer to the Fuzion™ Frame Installation Guide
(#GL44000) before proceeding any further. Complete
the installation and assembly steps according to the
Fuzion™ Frame Installation Guide.
Fuzion™ Control Panel Installation
The following cutouts must be clear and free of any dirt
or adhesive:
- Control panel cutout in the assembled wood frame
- Control panel cutout in the assembled counter
- Control panel cutout in the bathtub
Insert the wire connector(s) into the back of the control
1
panel (Figure 4). The J5 LCD control panel only
requires insertion of the black control box wire.
Sparingly apply adhesive around the base of the
2
control panel (Figure 5).
Thread the wire through the cutout and to the control
3
box.
Orient control panel in the following manner: the logo
4
will be on the right side of the J4 control panel when
you are sitting in the bathtub (the power button will be
on the right side of the J5 LCD control panel).
Lower the control panel into the cutout and press firmly
5
to embed the adhesive (Figure 6).
Connect the wire to the control box.
6
Please proceed to Step 3 in the Drop-In Installation
7
section.
Page 10
Fuzion™ Frame
Blower Wire
(Grey Wire;
not applicable for
J5 control panel)
Figure 5 - Adhesive Application
www.jacuzzi.com
Control Box Wire
(Black Wire)
Figure 4 - Control Panel
Inside of Bathtub
Figure 6 - Control Panel
Installation and Operation
Pure Air
®
Bath
Control Box Wire
Adhesive)

Publicité

Table des Matières

Dépannage

loading

Table des Matières