Jacuzzi PURE AIR BATH Série Instructions D'installation Et D'utilisation page 12

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Drop-in Installation (con't)
Install the unit, inserting the blower end first,
8
lowering the bathtub into the opening as shown in
the illustration (Figure 9).
DO NOT use plumbing fixtures or lines to lower the
unit. Allow the bathtub to rest on the supports.
Inspect all fittings, plumbing, and control
9
lines after inserting the bathtub to insure the
components are not damaged, disconnected, or
contacting the finish surface substrate or support
members.
Connect flex water supply lines to faucet and plug
10
power cords into GFCI outlet.
Remove scrap lumber and lower the bathtub fully
11
into the opening (Figures 10 and 11).
The bathtub must be fully supported from the
bottom. The bathtub must rest on the subfloor, or
be in contact with the leveling material.
Align the bathtub and connect the drain.
12
Turn on the power supply to the dedicated GFCI
13
protected circuits and check system operation.
Caulk around the perimeter of bathtub to seal
14
the space between the rim and the finished deck
(Figure 7 on previous page).
Page 12
Flat Subfloor
Figure 9 - Drop-In (side view)
Flat Subfloor
Uneven
Subfloor
www.jacuzzi.com
Scrap Lumber
Minimum 2˝
(50mm) Max
Thickness
Substrate
Member Support
Figure 10 - Support
Figure 11 - Support
Installation and Operation
Pure Air
®
Bath
Tile or
Finished
Surface
Floating
Floor
Compound

Publicité

Table des Matières

Dépannage

loading

Table des Matières