Prospray 3.25 Connection Diagram - WAGNER ProSpray 3.25 Mode D'emploi

Groupe de projection à haute pression
Masquer les pouces Voir aussi pour ProSpray 3.25:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Repairs at the unit
18. Slide the top of the piston (3) into the T-slot (9) on the slider
assembly (4).
19. Position the pump manifold (2) underneath the gear unit
housing and push up until it rests against the gear unit
housing.
20. Attach pump manifold (2) to the gear unit housing.
21. Screw pump manifold (2) tightly to gear unit housing.
and inlet valve housing with machine grease. Screw inlet valve
housing to the pump manifold.
11.4

ProSpray 3.25 connection diagram

Blue
Switch
Blue
P/N 0522053
Ground
Surge suppressor
Ground
P/N 0522052
Ground
Brown
Brown
Black
Blue
White
P/N 0551758
GB
23.
Unit on high-rider cart:
Thread the siphon tube into the inlet valve and tighten
with PTFE tape before assembly. Replace the return hose into
the hose clip on the siphon tube.
Unit on stand:
Insert the elbow on the siphon assembly into the bottom of
the pusher stem housing. Push the retaining clip up into the
groove inside the foot valve housing to secure the siphon
assembly in position. Place the return tube over the return
tube tting and secure with the clip.
24. Install front cover.
EMI Filter
Power Cord
Fuse block
Fuse
Black
Red
Black
White
Red
Black
Motor
38
Capacitor
Motor controller
Red (+)
Black (-)
L.E.D.
Hall sensor
Potentiometer
Display wire
assembly (P/N 0522022)
Pressure sensor
ProSpray 3.25

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

0558002055800305580340558035

Table des Matières